Taixing Yida propylene oxide project is in trial production – Amine Catalysts https://www.newtopchem.com The Leading Supplier of China Amine Catalysts Thu, 08 Sep 2022 08:06:29 +0000 zh-CN hourly 1 https://wordpress.org/?v=6.1.7 https://www.newtopchem.com/wp-content/uploads/2023/12/1.jpg Taixing Yida propylene oxide project is in trial production – Amine Catalysts https://www.newtopchem.com 32 32 Taixing Yida propylene oxide project is in trial production https://www.newtopchem.com/archives/40997 Thu, 08 Sep 2022 08:06:29 +0000 https://www.newtopchem.com/archives/40997 Latest News: Yida Co., Ltd. announced on the evening of September 6 that in the 150,000-ton propylene oxide project of Taixing Yida, a subsidiary of the company, the hydrogen peroxide unit has been running stably and has been sold. The propane plant is in trial production.

Program Brief

Project Name: Project with an annual output of 150,000 tons of propylene oxide

Construction scale: 150,000 tons of propylene oxide, 180,000 tons of hydrogen peroxide (60%), 2,095 tons of propane, 4,000 tons of propylene glycol ether

Main construction content: new production workshop, warehouse, control room, comprehensive building and dormitory, etc., with a total construction area of ​​109,632 square meters; the project purchases PO reactor, PO tower, oxygen stripper, heat exchanger, tank farm equipment and other major equipment 550 units (sets), forming an annual production capacity of 150,000 tons of propylene oxide, 180,000 tons of hydrogen peroxide (60%), 2,095 tons of propane, and 4,000 tons of propylene glycol ether.

Total investment: 1.025 billion yuan

Construction site: Taixing Economic Development Zone, east of Shatong Chemical, west of Academician Road, south of Yangsi Port, and north of Bote New Materials.

]]>